In Post Falls, Idaho, construction is moving forward on a large two-story convenience store and fueling center at the Highway 41 Interchange. Originally designed with wood, the project shifted to cold-formed steel for added strength and long-term performance.
All Wall Contracting, Inc. is leading the framing using SCAFCO studs and joists, including 1000S250-68m roof joists, 550S162-54m exterior walls, and 350S162-54m interior studs. Materials are being supplied through CWallA, helping keep the project on schedule while maintaining the original design intent. This upgrade highlights the continued shift toward steel in high-traffic, high-demand builds.
